IPC APEX EXPO: Hofer Discusses the Pros and Cons of Backdrilling


Reading time ( words)

General Manager James Hofer of Accurate Circuit Engineering discusses the process of backdrilling vias, including the benefits and drawbacks. Backdrilling can improve signal integrity, but it can create stubs that may act as unwanted antennas.

To watch this video, click here.

Share

Print


Suggested Items

Bert Simonovich on Modeling Copper Roughness

03/24/2019 | Andy Shaughnessy, Design007 Magazine
I met with one of our contributors, Bert Simonovich of Lamsim Enterprises, at DesignCon 2019. Bert’s paper on interconnect modeling was nominated as a Best Paper finalist, so I asked him to discuss his paper and some of the challenges that engineers and their customers are facing right now.

EMA: Cadence Moves Simulation Further Up in the Design Cycle

03/15/2019 | Andy Shaughnessy, Design007 Magazine
Cadence Design Systems recently integrated more of its Sigrity capabilities into the front end of its PCB design tools. During DesignCon, Chris Banton of EMA Design Automation spoke with me about how this drive for “model-less analysis” benefits the PCB designer who can now access signal and power integrity, DFM, and electrical rule checking functionality early in the design process and have fewer issues later.

Todd Westerhoff Discusses His New Position and Much More

03/07/2019 | Andy Shaughnessy, Design007 Magazine
At DesignCon, I met with our old friend Todd Westerhoff, a veteran signal integrity engineer. Todd joined Mentor, a Siemens Business, since we last spoke. We discussed his new job responsibilities, his drive to get more designers and engineers to use SI tools, and the increasing value of cost-reduced design techniques versus overdesigning PCBs.



Copyright © 2019 I-Connect007. All rights reserved.