-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueOpportunities and Challenges
In this issue, our expert contributors discuss the many opportunities and challenges in the PCB design community, and what can be done to grow the numbers of PCB designers—and design instructors.
Embedded Design Techniques
Our expert contributors provide the knowledge this month that designers need to be aware of to make intelligent, educated decisions about embedded design. Many design and manufacturing hurdles can trip up designers who are new to this technology.
Manufacturing Know-how
For this issue, we asked our expert contributors to share their thoughts on the absolute “must-know” aspects of fab, assembly and test that all designers should understand. In the end, we’re all in this together.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - design007 Magazine
What Happens When You Assume?
July 5, 2022 | I-Connect007 Editorial TeamEstimated reading time: 4 minutes
When we started planning a recent issue of Design007 Magazine on design with manufacturing, or DWM, we knew we needed I-Connect007 columnist Dana Korf to weigh in on this new acronym, and what true DWM would look like in operation. In this interview, Dana explains what it will take to achieve total communication among all the stakeholders in the PCB development cycle. He also stresses the need for everyone involved in PCB design and manufacturing to stop making assumptions, even at the risk of being labeled as “that guy” who asks too many questions.
Andy Shaughnessy: Dana, we’re hearing more talk about design with manufacturing, or DWM. For all the talk about DFM, communication among the designers, fabricators, and assemblers just doesn’t happen as often as we might expect. In your opinion, what does true DWM look like? And how do we get designers and manufacturers to embrace it?
Dana Korf: When I first heard about DWM, I thought it implied we were currently designing without manufacturing. I’m not clear what it actually means because that’s what we’re doing today. I’ve simplified the problem into three parts. First, the fabricators don’t provide all the design rules that front-end engineering uses to evaluate a design for their customers. In some companies, the process engineers won’t tell the front-end engineers all the rules.
Second, the data transfer we’re using is based on an N/C technique from the 1950s, with a lot of files, and people have to unintelligently guess what the data is supposed to be instead of using more intelligent formats like IPC-2581 or ODB++. Neither intelligent format is perfect, but they’re definitely better than Gerber-based packages. Third, the design tool can’t utilize the fabricator design rules even if they were provided.
I did a design review a couple of years ago with a tier one software supplier. I found that even if they were provided all the fabricator design rules electronically, they’d still have to perform a lot of scripting to incorporate most of the provided DFM rules. A common example I give is the minimum space between a conductor to the edge of a board. Is the edge scored? Is it routed? Is it punched? How are you making this? These have different sets of rules, most likely, and the design doesn’t necessarily have the right rules because the design system doesn’t have knowledge of how the edge will be created.
Over the years, we’ve just accepted this problem. In the `70s when I first got into this, we hand-taped artwork on Mylar. They photographically reduced it down to the proper size, and they built it. It was pretty simple. Then we invented CAM tools. That was where we went downhill, along with the first manufacturer who said, “I’ll fix your design for free.” That’s when design data quality went downhill.
Happy Holden: Yes. I’m not sure that DWM is actually real, because who in manufacturing has that kind of time to devote to a customer?
Dan Feinberg: My first thought is: Do you design for manufacturing, or do you design for the performance of the device? What comes first when you have to make a choice between cost and reliability?
Korf: Right. There are two problems for me. One is that board fabricators may not be selected until after the design is done, and they’re selected by procurement or the EMS company. They go out, source it, then select the suppliers at the end of the layout. You don’t know who you’re designing for. I teach a DFM class for IPC, and one of the things I teach is the IPC definition of DFM. It’s something along the lines of, “Design for optimum cost to manufacturability,” and I add, “and meets the design intent.”
To your comment, Dan, you’re really trying to make the board work first and then ensure it’s producible. Cost is actually third, because if they all come back and they don’t work, you’ve lost all your money anyway. I teach students that if you’re going to design for a manufacturer, figure out whether it’s the right one for you. Not every fabricator can build every capability, and not everyone has the same set of design rules for a given technology. That’s part of the problem, too. We’re chasing cost/price along with quality and performance. It’s a triangle; the old saying is that you can only get two out of three of those.
Shaughnessy: It sounds like a lot of these issues arose out of outsourcing. None of this happened during the time of captives.
Korf: That’s right. When you had in-house manufacturing, the factory could be tuned toward the product and everything was optimized. You had a lot less variability, a lot better chance of getting good designs out, and getting them right the first time. But, even then, they still had data errors.
To read this entire conversation, which appeared in the June 2022 issue of Design007 Magazine, click here.
Suggested Items
Enabling a New Paradigm for Flexible, Point of Need Design and Manufacturing
03/18/2024 | DARPAThe Department of Defense (DOD) needs the flexibility to manufacture critical structures at the time and point of need using locally available materials.
Join The Murray Percival Co. at IPC APEX EXPO 2024
03/15/2024 | Murray Percival CompanyThe Murray Percival Company, the award-winning leading supplier to the Midwest’s electronics industry, is excited to announce their participation in the upcoming IPC APEX EXPO, scheduled for April 9-11 at the Anaheim Convention Center in Anaheim, CA.
ROCKA Solutions Expands into Brazil
03/15/2024 | ROCKA SolutionsROCKA Solutions is thrilled to announce its expansion into Brazil. With a commitment to serving the growing needs of the Brazilian electronics manufacturing market, ROCKA has established new distribution and manufacturing services in the region.
Much Ado About Factory of the Future
03/13/2024 | Chris Jorgensen, IPCFor attendees looking for guidance on modernizing their manufacturing, IPC APEX EXPO 2024 will provide plenty of opportunities to learn about the latest innovations and how to begin applying them in your operations today. When walking the show floor, look for the IPC-CFX flags at vendor booths. These are equipment vendors who know the importance of IPC-CFX for their customers and the industry, and have demonstrated proficiency in IPC-CFX implementations.
DARPA Explores Additive Manufacturing’s Revolutionary Potential for Futuristic Microsystems
03/12/2024 | DARPADARPA played a seminal role in establishing materials science as a discipline. One of the latest disruptive efforts in new materials and applications, the Additive Manufacturing of Microelectronic systEms (AMME) program, seeks to launch microsystems manufacturing far beyond today’s state of the art.