Mentor Graphics Video: Concurrency During Schematic Design


Reading time ( words)

Increasing design efficiency is the biggest challenge in the PCB business today.

Design teams are pushed to continually add product functionality while reducing design time, cutting product costs, and improving product quality. A recent survey by Aberdeen identifies increased pressure to meet delivery deadlines as the number one driver of improvements in PCB processes.

The answer to this challenge is concurrent team work throughout the entire design flow.

Watch this video and learn how to reduce design time, cut product costs, and improve product quality by enabling PCB engineering teams to collaborate in real-time with concurrent schematic design technology.

Share


Suggested Items

Zuken Teams With Nano Dimension for 3D Printing Design Flow

11/22/2017 | Andy Shaughnessy, PCB Design007
At PCB West, Zuken shared a booth with Nano Dimension. Zuken has been working with Nano Dimension for some time, and adding support for 3D printing and nanotechnology to its design tool platforms. I sat down with Zuken’s Humair Mandavia and Nano Dimension’s Simon Fried to learn more about this alliance, and to find out more about this odd-looking box being demonstrated in Zuken’s booth.

Nine Dot Connects: Good Design Instruction is a True Value-Add

11/09/2017 | Andy Shaughnessy, PCBDesign007
Nine Dot Connects has certainly blazed an interesting trail. The company started out as an Altium reseller, but in less than a decade, Nine Dot Connects has also become a design service bureau and a provider of PCB design instruction, training, and consulting services. I recently interviewed Paul Taubman, technical services director for Nine Dot Connects. We discussed the company’s expansion from VAR to service bureau and content provider, and the changing landscape of PCB design instruction.

AltiumLive Summit—Munich, Germany, Part 2

11/13/2017 | Pete Starkey, I-Connect007
Pete Starkey continues with his review of the AltiumLive PCB Design Summit held recently in Munich, Germany. The second day commenced with a new product launch. “Working together is hard” it read on the screen. Statistics indicated that 33% of new products were late getting to market, of which 28% were late due to insufficient collaboration, and up to 50% of potential revenue could be lost through being late to market. Then the screen read “NEXUS makes it easy!”



Copyright © 2017 I-Connect007. All rights reserved.