The Shaughnessy Report: The PCB Design Supply Chain


Reading time ( words)

It’s not a simple task providing you all with information you can use. Most of you are really good at your job, and you could design just about any type of board that your boss throws at you. And you should be good; most of you are—ahem—seasoned veterans of the PCB design world. At this point in your career, you have this stuff down to a science.

You’re probably not going to discover a brand-new way to design boards, but you know that there’s always something to learn in this job: new design tips and tricks, changes in PCB technology, market trends, and much more.  As the ol’ saying goes, “You learn something new every day.” We certainly do!

So, we occasionally look at other design topics that are not directly related to PCB design and layout techniques—markets, legislation, materials, education, etc. Is there designer interest in this topic? This is what happened when we surveyed our readers a few months ago.

We asked readers of The PCB Design Magazine if their supply chain was a problem for them. Almost two thirds of respondents said no, but a solid 37% said yes. And surprisingly, for many it was an emphatic “yes.” Navigating the supply chain is a huge challenge for some of our leading companies.

What sort of bugaboos were designers referring to? Long lead times, parts obsolescence, multiple component changes and ECOs…you name it. Some designers said the parts selection process on the front end is the worst part of the design cycle, and their companies have had to stock more and more hard-to-find parts. Redesigning boards with obsolete parts ranked high too.

Even worse, some respondents said that the supply chain was the one thing they could not influence, much less control. Comments such as “We’re dealing with idiots” were typical. How would you like to work in a situation like that? Maybe you are right now. You have my sympathy.

To read this entire article, which appeared in the July 2015 issue of The PCB Design Magazine, click here.

Share

Print


Suggested Items

The Electronic Component Shortage Crisis: A Veteran Engineer’s Perspective

02/18/2019 | John Watson, CID, Legrand Inc.
From where we stand now, at the beginning of 2019, we see lead times for some components in the short range of up to 16 weeks; medium-to-high is 32 weeks, and long lead times are as far out as 80 weeks. In other words, if we ordered a component today, it would arrive in over a year a half from now (maybe). This all started with the capacitors (we will see why later), but we now see other component series being sucked into this problem.

Natasha Baker: Supply Chain Transparency Inside the CAD Tool

02/18/2019 | Nolan Johnson, PCB007
Natasha Baker, CEO and founder of SnapEDA, an online parts library, discusses the benefits of transparency in online libraries to designers, and discusses strategies on how to solve supply chain challenges, and more.

ESD Alliance Advisory Council to Shape ES Design West at SEMICON West

11/20/2018 | Globe Newswire
The Electronic System Design Alliance, a SEMI Strategic Association Partner, today hosted the first meeting of the Advisory Council of ES Design West co-located with SEMICON West 2019 West at San Francisco’s Moscone Center, July 9-11, 2019.



Copyright © 2019 I-Connect007. All rights reserved.