Optimum Design Associates President Nick Barbin has worn a lot of hats in this industry, from PCB designer to EMS company owner. We asked Nick to share his thoughts on what it’s like to design in a vacuum, while offering some strategies for escaping the vacuum. 

Andy Shaughnessy: How often do you design a board without knowing who is going to fabricate and/or assemble it?  

Nick Barbin: As a PCB design service provider, we are generally not always privy to this information unless we ask, and at Optimum, we do ask. It’s not so much that we care about the “who” aspect; it’s more about being in alignment with the specific manufacturer’s capabilities to ensure we are providing a design that meets our customer’s objectives for cost and reliability. This is especially important in the case of fabrication shops where capabilities tend to vary dramatically and can result in the shop requesting to modify the artwork to be able to meet the specifications called out. 

Shaughnessy: Why do so many designers not know who is going to manufacture their boards?  

Barbin: In the case of fabrication shops, once an OEM has qualified multiple vendors to build their boards, purchasing departments will consider that part number a commodity item, since it is generally one of the highest-cost items on any given bill of materials (BOM). In some cases, the OEM allows the commodity manager (CM) to choose the fabrication vendor. Because of these dynamics, it is very difficult for designers to keep track of specific vendors. Designers should have a pretty good idea of who their CM partner is, as most OEMs have one strategic vendor they rely on. Global time differences and language barriers may also contribute to designers not knowing who’s manufacturing their boards.  

Shaughnessy: What other missing information or data do you find yourself having to “design around?” 

Barbin: We believe designing around missing data is a mistake with unknown consequences. If there are missing datasheets or constraints that are truly missing, all efforts must be made to acquire the data or receive a satisfactory sign-off before moving forward. I cannot think of one instance where anything else would be acceptable. 

Shaughnessy: When you find yourself designing in a vacuum, what tricks have you devised as workarounds to get the job done? 

Barbin: Whether we are designing in a vacuum, at Optimum, we have documented our DFM (design for manufacturing) guidelines in our Designer Handbook so each of our designers have best DFM practices at their fingertips. Additionally, each designer has a checklist of over 90 items, many of which pertain to DFM, that must be checked off as completed or considered for each design that is delivered. This is part of our ISO 9001-2015 quality control system. Lastly, each design must pass through a DFM check using the Valor NPI software from Siemens. It is Optimum’s objective to ensure each of our designers deliver data for their respective designs to the downstream manufacturers that is both comprehensive and manufacturable to each of our customer requirements. 

Shaughnessy: What are some of the hidden costs, in addition to monetary, of designing in a vacuum? 

Barbin: Delayed time to market certainly comes to mind. The minute a released manufacturing package cannot be manufactured as-is and needs to be modified, the project is immediately put on hold waiting for approvals or answers. This can delay the development cycle by days and weeks as it progresses through many email mailboxes.

To read this entire conversation, which appeared in the May 2022 issue of Design007 Magazine, click here.

Share




Suggested Items

Master the Art of Communication With Manufacturers

06/30/2022 | Kyle Burk, KBJ Engineering
As mentioned in the May issue of Design007 Magazine, design is performed, at times, in a vacuum. But it doesn’t have to be that way. Whenever circumstances allow, design should be performed by communicating with all stakeholders throughout the design process, hence the emphasis on the word with in DWM. Communication can occur through personal correspondence such as email and voice conversations or through more formal design meetings—in person or through videoconferencing. No matter which means of communication you prefer, it’s important to communicate early and often with stakeholders involved in the downstream processes as you bring your project to realization.

Altimade Puts Designers and Manufacturers Together

06/24/2022 | Andy Shaughnessy, Design007 Magazine
Despite all of the talk about the need for communication between designers and manufacturers, many PCB designers still do not talk with their manufacturers for a variety of reasons. Altium and MacroFab aim to change this dynamic. In this interview, Ted Pawela, chief ecosystem officer of Altium and head of Altium’s Nexar Business Unit, and MacroFab CEO Misha Govshteyn, discuss the new Altimade manufacturing service that Altium is introducing in partnership with MacroFab. Ted and Misha provide an overview of the Altimade process, how it links designers to fabricators, assembly providers, and component distributors, and they explain how it could pave the way for true design with manufacturing, or DWM.

The Survey Said: Why Don’t You Know Your Fabricator?

06/23/2022 | I-Connect007 Editorial Team
When we want to find out what challenges our readers are facing, we just ask. And they don’t mind sharing—the good, the bad, and the ugly. In a recent survey, we asked our PCB designer readers, “Why don’t you know who is going to manufacture your boards?” Here are some of more interesting replies we received, edited slightly for clarity. Do you see yourself in these replies?



Copyright © 2022 I-Connect007. All rights reserved.