SAP Certifies Zuken Interface for S/4HANA


Reading time ( words)

Zuken, a global technology leader in digital engineering for electronic and electrical systems, announces the release of the "SAP Engineering Control Center interface to Zuken." This new interface enables the integration of its CR-8000/DS-CR and E3.series/DS-E3 engineering systems into SAP S/4HANA, SAP's latest-generation ERP system.

The interface supports a bidirectional exchange of material master data and documents as well as CAD data and product structure information between Zuken's electronic and electrical engineering systems, CR-8000/DS-CR and E3.series/DS-E3, and SAP S/4HANA. The integration enables data and metadata generated in Zuken’s tools to be used in company-wide business processes managed in SAP, such as concurrent engineering, module management, configuration management, component management, and change and release management.

In detail, the integration supports the following processes in both the Zuken and SAP domains:

  • Creation and exchange of component master data
  • Release of approved components and blocking of discontinued components
  • Exchange of manufacturing data, metadata, and parts lists between Zuken and SAP
  • Optional creation and alignment of product structures
  • Control of workflow and change processes

The certified interface is based on the SAP Engineering Control Center | SAP ECTR software product developed by SAP Platinum Partner, DSC SOFTWARE AG, based in Karlsruhe, Germany. This is SAP's standard integration platform for MCAD, ECAD and MS Office in SAP PLM. Following the successful certification through SAP, the Zuken interface is now available for purchase from SAP.

"The certification and addition of the SAP Engineering Control Center interface for Zuken to the SAP price list represents an additional element of investment security for our customers in a rapidly changing IT world,” said Oliver Hechtl, Zuken Head of Technology and Services Europe. "It provides our customers with the assurance that engineering data and information generated in Zuken's best-in-class engineering software can be leveraged to support cross-enterprise digital business processes."

Dominik Maier, Senior Vice President Products & Development and Authorized Signatory, of DSC added: “The direct integration for Zuken is another important milestone on the SAP ECTR roadmap. It demonstrates our continued commitment to expanding the integration capabilities of SAP ECTR, and, consequently SAP PLM, together with SAP and other key partners. We are very pleased that Zuken users can now take full advantage of the SAP ECTR direct integration.”

Share




Suggested Items

EMA Helps Ease Designers’ Supply Chain Woes

10/20/2022 | Andy Shaughnessy, Design007 Magazine
Supply chain issues are continuing to cause disruptions in our industry, though lead times have dropped from astronomical to merely troublesome. In this interview, Chris Banton, EMA Design Automation’s director of marketing, explains how Cadence’s software has evolved as designers’ needs have changed in the past few turbulent years, including providing designers with component availability data early in the process.

Altium’s EDDI Report Tracks Components’ Availability—Today and Historically

09/15/2022 | I-Connect007 Editorial Team
There’s one lesson that all designers have learned over the past few years: Components might be here today and gone tomorrow, so tracking your parts is more important than ever. Any resources that help you keep tabs on your required parts are invaluable in these days of 40-week lead times. Earlier this year, Altium released one such resource: the Electronic Design to Delivery Index (EDDI) report. Assembled from millions of bytes of data gleaned from the Octopart search engineer and the Nexar platform, the monthly EDDI report provides part availability histories going back years, as well as a real-time snapshot of global inventories.

What Happens When You Assume?

07/05/2022 | I-Connect007 Editorial Team
What is design with manufacturing and what does true DWM look like in operation? In this interview, I-Connect007 columnist Dana Korf explains what it will take to achieve total communication among all the stakeholders in the PCB development cycle. He also stresses the need for everyone involved in PCB design and manufacturing to stop making assumptions, even at the risk of being labeled as “that guy” who asks too many questions.



Copyright © 2023 I-Connect007 | IPC Publishing Group Inc. All rights reserved.