March 2021 Issue of Design007 Magazine Available Now


Reading time ( words)

Keeping bad data out of your design involves a lot of detective work. Designers and design engineers need to assess the accuracy and completeness of data at every step of the design process. If one small error in a footprint or schematic goes unnoticed, the CAM engineer may be calling with bad news on Friday afternoon. So, in the March issue of Design007 Magazine, we asked our expert contributors to discuss their special operations and tactics for keeping bad data out of their designs.

Download your copy today on the virtual newsstand or subscribe here for delivery in your email inbox.  

Share




Suggested Items

What Happens When You Assume?

07/05/2022 | I-Connect007 Editorial Team
What is design with manufacturing and what does true DWM look like in operation? In this interview, I-Connect007 columnist Dana Korf explains what it will take to achieve total communication among all the stakeholders in the PCB development cycle. He also stresses the need for everyone involved in PCB design and manufacturing to stop making assumptions, even at the risk of being labeled as “that guy” who asks too many questions.

Rambus Driving a CXL Memory Option

06/30/2022 | Nolan Johnson, I-Connect007
In this interview with Arjun Bangre, director of product for high-speed interface IPs for PCI Express and CXL at Rambus, the discussion revolves around new developments in CXL, PCI Express, and interoperable IP solutions that Rambus has developed.

Master the Art of Communication With Manufacturers

06/30/2022 | Kyle Burk, KBJ Engineering
As mentioned in the May issue of Design007 Magazine, design is performed, at times, in a vacuum. But it doesn’t have to be that way. Whenever circumstances allow, design should be performed by communicating with all stakeholders throughout the design process, hence the emphasis on the word with in DWM. Communication can occur through personal correspondence such as email and voice conversations or through more formal design meetings—in person or through videoconferencing. No matter which means of communication you prefer, it’s important to communicate early and often with stakeholders involved in the downstream processes as you bring your project to realization.



Copyright © 2022 I-Connect007. All rights reserved.