Zuken Partners with CADENAS and ECAD-Port


Reading time ( words)

Zuken has signed partnership agreements with CADENAS, a provider of online component libraries, and ECAD-Port, a specialized provider of electrical component library services.

The three partners are working together to provide online access to free, validated, high-quality electrical component data to users of Zuken’s E³.series electrical design tools. The agreement will extend the CADENAS offering of intelligent engineering data from more than 700 component manufactures through the addition of electrical content provided directly by OEM component manufacturers. The partnership is expected to rapidly grow the CADENAS library from its current number of 250 electrical, fluid and automation manufacturers. It will achieve these benefits for electrical designers:

  • Users of Zuken’s E³.series ECAD environment will gain direct access to the CADENAS component portal where they can search for components and load the required parts directly into E³.series. This digital engineering data are enriched with intelligent information such as electronic symbols, connections points and technical product information.
  • ECAD-Port will be available as a service provider to OEMs for content creation and attribute mapping services using both eCl@ss and E³.series formats.
  • ECAD-Port will provide mapping assistance to all E³.series customers who operate an E³.database, offering specific attributes or content such as individual ERP number or customer specific symbols.

Through the collaboration with CADENAS, Zuken is building on its commitment to industry standards.

“We have been supporting the eCl@ss initiative for many years,” said Joachim Frank, Managing Director of Zuken E3. “Zuken’s intention was to provide users a reliable source of high-quality manufacturer certified component information. Therefore, CADENAS’ data portal was our first choice.”

Jürgen Heimbach, CEO of CADENAS said, “Our cooperation with Zuken opens new opportunities to the electrical engineering community. Through providing intelligent enriched engineering data, electrical engineers no longer need to manually search and add information. This saves valuable time for their product development.”

The initiative has already seen positive response from leading component manufacturers, with endorsements from HARTING, Weidmüller, Phoenix Contact, WAGO and TE Connectivity Technology Group. Comprehensive libraries from further industry leaders are under way.

For more information:

 

 

Share




Suggested Items

What Happens When You Assume?

07/05/2022 | I-Connect007 Editorial Team
What is design with manufacturing and what does true DWM look like in operation? In this interview, I-Connect007 columnist Dana Korf explains what it will take to achieve total communication among all the stakeholders in the PCB development cycle. He also stresses the need for everyone involved in PCB design and manufacturing to stop making assumptions, even at the risk of being labeled as “that guy” who asks too many questions.

Rambus Driving a CXL Memory Option

06/30/2022 | Nolan Johnson, I-Connect007
In this interview with Arjun Bangre, director of product for high-speed interface IPs for PCI Express and CXL at Rambus, the discussion revolves around new developments in CXL, PCI Express, and interoperable IP solutions that Rambus has developed.

Master the Art of Communication With Manufacturers

06/30/2022 | Kyle Burk, KBJ Engineering
As mentioned in the May issue of Design007 Magazine, design is performed, at times, in a vacuum. But it doesn’t have to be that way. Whenever circumstances allow, design should be performed by communicating with all stakeholders throughout the design process, hence the emphasis on the word with in DWM. Communication can occur through personal correspondence such as email and voice conversations or through more formal design meetings—in person or through videoconferencing. No matter which means of communication you prefer, it’s important to communicate early and often with stakeholders involved in the downstream processes as you bring your project to realization.



Copyright © 2022 I-Connect007. All rights reserved.